|
 |
|
Blossom Way
Planned length: 19.7 miles
Constructed to date: 8.75 miles
A popular section of the Blossom Way Trail begins on the
south side of Rogers High School on Dixieland Road. The
Blossom Way Trail links nearly all the city trail systems
together. When complete, it will stretch from Lake Atalanta
in northeast Rogers to the Osage Creek area to the west, and
link with both the Turtle Creek Trail and the Mt. Hebron
Trail. The trail will also connect a number of schools with
nearby neighborhoods and commercial areas. It was the first
trail section in the city’s Master Trail Plan that the city
began constructing. The Blossom Way Trail section south of
Rogers High School on Dixieland Road includes two 90-foot
bridges and a 54-foot bridge each constructed from former
railroad cars. A tree-covered section of trail winds along
the Blossom Way Creek, providing a picturesque setting and
opportunities for spotting wildlife. The trail also includes
walking paths through and around Veteran’s Park.
PDF Trail Map
|
|
|